Renovation Update 2/2/19

It may have been cold outside, but Adam, Caleb and the crew from KC Custom Design were hard at work inside this week. We passed the city electrical and plumbing inspections on Wednesday, so they were able to fill in the giant trenches in the floors, and put up walls.

No more trenches in the floor! The new bathroom is to the left, and the new entrance to the utility room/dog wash is in the middle.

The dog wash has been filled in. They will install some cool-looking tile around the base.

Adam Farinelli demonstrates the adjustable nozzle for the dog wash to Board members Gina Carnahan and Angie Bloss.

In the kennel room, the walls and ceiling are in place! It actually looks like a kennel, instead of a dark old garage.

Walls of the new kennels. The door in the middle of the picture will be replaced by a window.

Outside, they have staked out the outlines of the play yards. They plan to install the fence posts this week, weather permitting. They will also dig a drainage ditch around the north side.

The future corner of the Small Play Yard (left) and Large Play Yard (right).

We also picked out colors for the walls. It’s starting to come together!